F collection Parallel Shaft-CZPTcal Geared Motor Characteristics
one.Features:
- Large effectiveness: 92%-94%
- Parallel output, compact framework, huge output torque, clean operation, lower noise and extended services life.
- Large precision: the equipment is manufactured of high-top quality alloy steel forging, carbonitriding and hardening therapy, grinding method to make certain high precision and stable operating.
- High interchangeability: highly modular, serial design, sturdy versatility and interchangeability.
two. CZPT parameters
Ratio | three.77-276.77 |
Input electrical power | .12-200KW |
Output torque | three.5-21700N.m |
Output velocity | 5-352rpm |
Mounting sort | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Approach | Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor |
Brake Release | HF-handbook launch(lock in the brake release situation), HR-guide release(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Kind | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 substantial-toughness forged iron from R37,forty seven,57,sixty seven,seventy seven,87 |
Housing substance | HT250 Higher toughness cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment |
Efficiency | 92%-ninety four% |
Lubricant | VG220 |
Security Course | IP55, F class |
CZPTshine Generate
ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a condition-owned navy mould business, was recognized in 1965. CZPTshine specializes in the total electrical power transmission remedy for high-conclude tools manufacturing industries dependent on the aim of “System Solution, Software Design and Professional Services”.
CZPTshine have a robust specialized pressure with over 350 personnel at existing, such as in excess of thirty engineering technicians, thirty quality inspectors, covering an region of 80000 sq. meters and sorts of advanced processing machines and testing equipments. We have a very good basis for the industry software improvement and provider of higher-end pace reducers & variators possessing to the provincial engineering engineering study centre,the lab of gear speed reducers, and the foundation of modern day R&D.
Our Staff
High quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
All our goods get ISO & CE & UL certification.
Packing
Delivery